COUNCILS, REGULATORS & CROWN

Every site on the list is waiting
for a budget or a storm.

Regen closes legacy liabilities on public land. Containerised plant deploys to the site, the contaminant leaves as drums of concentrate, and the job closes with verification built for public scrutiny. The same budget starts closing more sites.

THE SITUATION

The liability is already public. The options haven’t changed.

The Portfolio

Closed tips, old dips, former yards, made ground under reserves. The sites nobody recorded at the time are the sites you administer now.

The Portfolio

Closed tips, old dips, former yards, made ground under reserves. The sites nobody recorded at the time are the sites you administer now.

The Loop

Dig-and-dump moves a public liability to a landfill, often inside your own district. The problem is relocated, not closed, and the file stays open somewhere.

The Loop

Dig-and-dump moves a public liability to a landfill, often inside your own district. The problem is relocated, not closed, and the file stays open somewhere.

The Exposure

Erosion and flooding are opening sites that were never meant to see daylight again. When the coastline sets the timeline, the programme stops being yours.

The Exposure

Erosion and flooding are opening sites that were never meant to see daylight again. When the coastline sets the timeline, the programme stops being yours.

The Maths

In most streams the contaminant is under one percent of the mass. Paying to cart and bury the rest is why the budget closes so few sites.

The Maths

In most streams the contaminant is under one percent of the mass. Paying to cart and bury the rest is why the budget closes so few sites.

WHAT WE TAKE ON

The sites the public is holding.

Legacy agrichemical & dip sites
Closed landfill exposures
Former industrial land
Reserves & public land
Unplanned finds

If the site isn’t here, that’s a conversation, not a no.

THE ENGAGEMENT

How it works.

01

Characterise

Send the site history and the lab data, direct or through your consultant. We come back with a recovery pathway and a price, in days.

01

Characterise

Send the site history and the lab data, direct or through your consultant. We come back with a recovery pathway and a price, in days.

02

Deploy

Regen is containerised plant. It deploys to the site, so material is treated where it sits instead of moving through the district as hazardous load.

02

Deploy

Regen is containerised plant. It deploys to the site, so material is treated where it sits instead of moving through the district as hazardous load.

03

Recover

The contaminant leaves as drums of concentrate. The cleaned fraction, about 99% of the mass, stays on the land or returns as clean fill.

03

Recover

The contaminant leaves as drums of concentrate. The cleaned fraction, about 99% of the mass, stays on the land or returns as clean fill.

04

Close

Every job closes with independent laboratory verification, reported as mass balance. The numbers reconcile or the job is not done.

04

Close

Every job closes with independent laboratory verification, reported as mass balance. The numbers reconcile or the job is not done.

THE OUTCOME

What changes for the district.

The File

The outcome is verified, not managed. Liabilities close instead of relocating to the next budget round.

The File

The outcome is verified, not managed. Liabilities close instead of relocating to the next budget round.

The Budget

The spend goes on the contaminant, not on carting the mass that was never the problem. The same dollars reach more sites.

The Budget

The spend goes on the contaminant, not on carting the mass that was never the problem. The same dollars reach more sites.

The Movement

Hazardous mass leaving site drops by up to 1,000 to 1. What once moved through town as a truck convoy leaves as drums.

The Movement

Hazardous mass leaving site drops by up to 1,000 to 1. What once moved through town as a truck convoy leaves as drums.

The Community

An outcome you can stand in front of a public meeting with. The contamination is gone, the land is back in use, and the recovered value stayed onshore.

The Community

An outcome you can stand in front of a public meeting with. The contamination is gone, the land is back in use, and the recovered value stayed onshore.

DOCUMENTATION

A file built for public scrutiny.

Every job closes with the documentation public accountability runs on: site and stream characterisation, chain of custody, processing record, independent laboratory verification, and a reconciled mass balance. The record stands up to audit, official information requests and the public gallery.

All independent testing work is carried out by the best IANZ-accredited laboratories.

The numbers reconcile or the job is not done.

DOCUMENTATION

A file built for public scrutiny.

Every job closes with the documentation public accountability runs on: site and stream characterisation, chain of custody, processing record, independent laboratory verification, and a reconciled mass balance. The record stands up to audit, official information requests and the public gallery.

All independent testing work is carried out by the best IANZ-accredited laboratories.

The numbers reconcile or the job is not done.

VERIFIED OUTCOME

Legacy agriculture soil. Metals and pesticides, one pass.

A stockpiled soil from a former agricultural site carried the classic legacy signature: arsenic, lead and organochlorine pesticides including dieldrin and DDT. Co-contamination like this normally forces a choice between two bolted-together technologies or the landfill. Regen achieved:

99.96%

Dieldrin removal in a single pass

Non-detect

Full pesticide suite to non-detect

7 days

Sample to independent certification

Every job closes the same way. Independent laboratory verification, reported as mass balance.

VERIFIED OUTCOME

Legacy agriculture soil. Metals and pesticides, one pass.

A stockpiled soil from a former agricultural site carried the classic legacy signature: arsenic, lead and organochlorine pesticides including dieldrin and DDT. Co-contamination like this normally forces a choice between two bolted-together technologies or the landfill. Regen achieved:

99.96%

Dieldrin removal in a single pass

Non-detect

Full pesticide suite to non-detect

7 days

Sample to independent certification

Every job closes the same way. Independent laboratory verification, reported as mass balance.

VERIFIED OUTCOME

Legacy agriculture soil. Metals and pesticides, one pass.

A stockpiled soil from a former agricultural site carried the classic legacy signature: arsenic, lead and organochlorine pesticides including dieldrin and DDT. Co-contamination like this normally forces a choice between two bolted-together technologies or the landfill. Regen achieved:

99.96%

Dieldrin removal in a single pass

Non-detect

Full pesticide suite to non-detect

7 days

Sample to independent certification

Every job closes the same way. Independent laboratory verification, reported as mass balance.

Stop paying to bury it.

Send the analysis if you have it. Send the problem if you don't.
We'll come back with a recovery pathway and a price.
Stop paying to bury it.
Send the analysis if you have it. Send the problem if you don't. We'll come back with a recovery pathway and a price.
Stop paying to bury it.

Send the analysis if you have it. Send the problem if you don't. We'll come back with a recovery pathway and a price.